| 英文摘要 |
With the ongoing development of sewerage infrastructure projects, the selection of shaft excavation methods plays a critical role in ensuring construction safety, project timelines, and overall quality. This study adopts a case study approach to compare two commonly used shaft construction methods in sewerage projects: the gravity-type caisson method and the hydraulic jacking steel caisson method. Using a real-world case from Longjing District in Taichung City, the research explores differences and challenges encountered during construction from the perspectives of progress, geological conditions, and safety. The key factors affecting the performance of caisson construction are analyzed, with particular emphasis on the advantages offered by the hydraulic jacking method. Although the hydraulic jacking steel caisson method involves higher costs due to the need for specialized equipment and advanced technical expertise, actual project applications remain limited. By integrating practical case data, construction records, and relevant literature, this study systematically examines the technical challenges associated with caisson construction. Practical recommendations for method selection are proposed, aiming to fill gaps in existing academic research while providing valuable reference for planning and execution of similar engineering projects. |