| 英文摘要 |
This study takes linear container quay as the main research topic, and uses the E8-E11 linear quays of the east coast container terminal of Keelung for simulation model. A model with five plans and a ship schedule of one week was proposed to explore the impact of mega-size ships on the operational performance of the port. Since mega-size ships’berth is limited by the berth length overall and centralized port call of mega-size ships, this would reduce the number of docking ships and increase the number of loading and unloading containers. On the contrary, it will reduce the efficiency of terminal operations and increase the detention time of the ships. As a consequence, terminal operators can improve the performance of terminal operations by appropriately configuring the ratio of mega-size ships to small ships. The results indicate that the ratio of mega-size ships to total number of ships is 4:21 (ratio 19.05%), which is an extraordinary plan. Therefore, appropriately lower the number of small ships and increase the number of mega-size ships will help to promote the efficiency of terminal operations. |