英文摘要 |
In recent years, the units of the military units have been greatly reduced due to the organization of human resources, and the number of engineering personnel has been greatly reduced. In order to cope with the shortage of manpower, the use of the relevant procedures for the design, planning and supervision of the commissioned technical service suppliers Service, but found that the results are not better than expected, so the study commissioned by the agency commissioned by the service technology manufacturers to create a project to explore the risk factor to explore the risk of the development of the assessment model, according to the degree of risk to take preventive measures. In this study, we first use the literature collection and expert questionnaire to establish the risk factors of the project project, and apply the modified Delphi method to carry out risk facet screening, and use the hierarchical analysis method to determine the risk factor corresponding to the weight value, and finally establish risk prevention Measures to advise the table, to provide military engineering personnel engaged in reference and use. |