| 英文摘要 |
This article examines the temporal politics of Taiwan’s energy transition through the redevelopment dispute surrounding the Hsieh-ho Power Plant and the proposed Fourth LNG Receiving Terminal. Infrastructure conflicts are commonly framed as issues of spatial justice, such as siting disputes or ecological damage. This study argues that they are also struggles over temporal orders and should be analyzed through the concept of timescapes. Based on fieldwork conducted between 2018 and 2025, including interviews and document analysis, the study analyzes three interrelated timescapes. The institutional timescape is shaped by policy timetables, environmental impact assessments, and electoral cycles that structure a dominant trajectory of transition. The technological timescape centers on construction schedules, safety stock requirements, and power-system logic framed as“indispensable.”In contrast, the organic timescape emerges from coral reproduction, fish migration, and residents’embodied perceptions, which are mobilized as alternative political language. The analysis shows that these timescapes are not naturally given but produced through the skillful making of time. Actors on all sides draw on knowledge, experience, and bodily practice to contest temporalities, revealing inequalities and competing imaginaries of the future. Political subjectivities emerge through the friction among timescapes. The article concludes by proposing a“rhythm of hope”as a counter to linear temporal regimes and argues for placing the skillful making of time at the center of energy research. |