| 英文摘要 |
The purpose of this paper is to study the failure cause of BSSF slag processing equipment. The BSSF was used to process BOF slag. Molten BOF slag was dumped on the feeding hopper surface coated with lime paste, and then the cooling water was sprayed on it to cool down the slag. After that, the chilled slag fell into rotary drum to be granulated into solid particles. The service life of the previous cast iron feeding hopper was about 5−6 months, but life expectancy of the new placed ductile cast iron was only about 26 days, which was being used because the feeding hopper was difficult to be replaced, and might affect the equipment operation efficiency seriously. For speculating the failure cause, some investigations and studies were performed. Including appearance examination, material composition, metallography analysis, surface SEM/EDS analysis and corrosion products analysis etc.. From the analysis results it was speculated that the failure cause of the BSSF feeding hopper was resulted from both thermal shock and corrosion phenomena. After slag dumping, compressive stress arose at local high temperature area of the feeding hopper surface, while cooling water was sprayed on it. The feeding hopper surface would suffer from tensile stress and resulted in thermal shock phenomenon. In addition, the surface and oxide would be corroded by alkaline solution and chloride ion, which led to the formation of local pits. These pits would further cause the stress arise and resulted in surface cracks initiation more easily. Through the repeated heating, cooling and corrosion effects, cracks developed gradually towards internal and led to the failure of the feeding hopper. |