The main function of blowing compresser was used in boiler for blowing away fly ash. The heat exchanger was serious blow out during the system staring operation in 1996. The failure heat exchanger was more than 68 tubes, about 63% by total 108 tubes, for uniaxial stress systems; there will be an array of parallel cracks, which are perpendicular to the direction of principal stress. The failure analysis corrosion fatigue continues to be a serious cause of failure. The stress source was attributed to fluid vibration, residual stress of fabrication and corrosive in cooling water. |