| 英文摘要 |
Structural steel beam is required to apply fireproofing coating on the ground of straucture integrity in case of fire accident. However, in high humidity and acidic rain envoronment the corrosion rate of steel under fireproofing coating could be too high to be acceptable. In this study, a specially designed corrosion monitoring probe was used to measure the corroion rate of steel under fireproofing coating and to evaluate the effect of surface preparation before the application of fireproofing coating. Corrosion environment was simulated by daily spraying of pH=4 diluted sulfuric acid onto the fireproofing coating. After 2 months of exposure, the corrosion rate of steel under fireproofing coating was detected to be as high as 0.82 mm/yr. With the application of inorganic zinc rich primer on the steel surface below fireproofing coating could reduce the corrosion rate of steel substantially. The corrosion rate of zinc rich primer layer detected is around 9.5 µm/yr. |