月旦知識庫
 
  1. 熱門:
 
首頁 臺灣期刊   法律   公行政治   醫事相關   財經   社會學   教育   其他 大陸期刊   核心   重要期刊 DOI文章
Journal of Engineering, Project, and Production Management 本站僅提供期刊文獻檢索。
  【月旦知識庫】是否收錄該篇全文,敬請【登入】查詢為準。
最新【購點活動】


篇名
Evaluation of the Satisfaction Metrics used by Stakeholders on Large Engineering Projects
並列篇名
Evaluation of the Satisfaction Metrics used by Stakeholders on Large Engineering Projects
作者 Abimbola Windapo (Abimbola Windapo)Gcinulwazi Qamata (Gcinulwazi Qamata)
英文摘要
This paper examines stakeholder perspectives on the use of satisfaction metrics in large engineering projects and asks whether there is a significant difference in the perception of the stakeholders on the use of satisfaction metrics. The rationale for the examination stems from the view by scholars that difficulty experienced by project managers on projects is as a result of the different perception of project performance criteria within the stakeholder group. The study makes use of existing literature in identifying the satisfaction metrics used by stakeholders on construction projects. A mixed method research approach incorporating both objective and subjective paradigms was used in the study to collect empirical data from stakeholders working on four large construction sites being procured by a South African State Owned Company (SOC). The data was collected using a structured questionnaire and focused group interviews. The study established that there are significant differences in the views of participants on important satisfaction metrics. The level of use of this form of success criteria was found to be more important to the client followed by the consultants – engineers and architects, while the project management team perceived it as being of less importance. The paper recommends that clients of large engineering projects should put in place strategies that will bring about explicit communication between the different stakeholders and an avenue for softening the boundary relationships that may exist between them. The research conducted is restricted to one SOC in South Africa and its four sites. Non-disclosure by the SOC of the performance of the projects under construction also brought about difficulties. Therefore, future research, which would explore the validity of these research findings with another comparable SOC project, is recommended.
起訖頁 82-90
關鍵詞 Infrastructure deliveryparticipatory action researchchange management
刊名 Journal of Engineering, Project, and Production Management  
期數 201507 (5:2期)
出版單位 Association of Engineering, Project, and Production Management
該期刊-上一篇 Engendering Change within a Water Infrastructure Client Organisation: A Participatory Action Research Approach
該期刊-下一篇 A Methodology for Reducing Bench Strength in Information Technology Companies
 

新書閱讀



最新影音


優惠活動




讀者服務專線:+886-2-23756688 傳真:+886-2-23318496
地址:臺北市館前路28 號 7 樓 客服信箱
Copyright © 元照出版 All rights reserved. 版權所有,禁止轉貼節錄