英文摘要 |
This paper presents an application of artificial fish swarm algorithm tonetwork reconfiguration and distributed generation in a distribution system.The distribution system reconfiguration uses an improved heuristicalgorithm to reduce total system losses, the installation of distributedgeneration (DG), to improve the system voltage. This paper uses theparticle swarm algorithm (PSO) to perform optimal of DG capacity configurations,IEEE 33-bus distribution system as a test system and finally,makes a comparison with related literature. |