英文摘要 |
In recently years, traffic flow of Chun-Shan Freeway has increased tremendously. As a result, many accidents of the workers performing guarding, clearing, and maintaining jobs have been reported. In this study, a cause-and-effect model which is established by the use of one-way and two-way analysis. Also, the Job Safety Analysis is performed to eliminate the unsafe behevior, equipments, and environment. It is hoped that through these results obtained from this study are able to establish correct job procedures as well as to prevent further accidents in the future. |