英文摘要 |
In recent years, the Taiwanese government has established a number of flood water prevention systems, including dikes, pumping stations and drainage systems to effectively reduce the downstream flooding. At the same time, with the catchment area of land development and utilization, the result was that the original design of flood control facilities might be less relevant in the light of land development. So, it has become increasingly necessary to effectively control of the upper and middle reaches of the river basin development of hillside land to non-engineering methods in river basin management, downstream flooding. The main purpose of this project is to simulate the inundation area within different status of non-urban planning areas of land to increase the degree of development, such as 0%, 10%, 20%, 40%, 60%, and under 4 different return periods, such as 25 years, 50 years, 100 years and 200 years, for intensive rainfall events. The simulation results can be employed to assess the flooding impact in the downstream lowland and to establish the policy analysis tools for the hillside land development . |