| 英文摘要 |
The first order leveling survey and benchmarks are often done and set up along with the main road, so it takes a long time to form a closed networks. In this situation, the only way to make sure and keep precision is monitoring the differences of forward and backward measurements and circuit measurements. This study used 173 benchmark measurements in continued 3 years to create 3 circle loops, then did network adjustment and analyzed the result. The results showed the maximum of RMS is 1.5cm. Therefore, based on Taiwan Vertical Datum 2001 and the first order leveling data of 2008, we used The method of mean gap and t-test to analyze the displacement significance of the whole networks and the single point, examining the leveling data to find out the sinking area, then resurveying and discussing the reasons of the exceeding differences of circle measurements. In this study, two bad leveling sections have been detected. We added the leveling sections data into the adjustment, and the differences of circuit measurement had been in accordance with the precision, increasing 40% with RMS maximum decreasing to 0.9cm. This study demonstrates to analyze the sources of difference and to narrow the range, worthy to the leveling survey. |