英文摘要 |
To avoid colliding against, the high-speed railways are alwaysconstructed in double lines. In the operation of single-stopping pattern, theoperators just need to dispatch trains in the safe headway. But in the patternof multi-stops, the operation is rather complicated in the initial timetables.Traditionally, the initial tables are decided first in the process oftimetabling and then the solving of conflicts are made to ensure the safety ofoperation. The initial timetables include the plans to run all trains stoppingin different patterns. Because the operation is the pattern of multi-stops, theconflicts among trains are inevitable. The more complicated in the mixture ofstopping pattern the more numbers of conflicts are. The issue will be achallenge to the operation of Taiwan High Speed Railway. To solve the problem,we constructed three simulation models to detect and solve the conflicts in theinitial timetables. The approaches employed in the models were expresspreempting, safe separating and conditional waiting. Three models were alsotested by the planning data of Taiwan High Speed Rail. The results showed thatexpress preempting would result in much more waiting time to more-stop trains.Safe separating would reduce the effective capacity of line. Conditional waitingcould get an eclectic result between both approaches cited above. |