英文摘要 |
The study presented new methods to solve the problem of export container yard pre-marshalling plan. This problem can be divided into two issues, space yard container loading time and space yard suffix work sequence, to discuss. Since the trend of large-scale ship become a profitable transportation strategy, stacking method has been adopted to solve limited land resource problem in the container terminal. This operation model will cause decreased work efficiency. In this study, cooperating with mathematic integrated method to get the total work time and the work contents contain in each problem based on the concepts of the constraint programming and split. The proposed methods are adopted to increase work efficiency in container terminal yard. |