英文摘要 |
Expressways provides a path for fast-moving traffic, as the development of city increases traffic demand, the original design of the ramp and signal control has made the surface intersection become bottleneck.This research took No.65 Expressway Xinzhuang 2nd Interchange Southbound Exit as an example, the site locates at Xinzhuang 2nd Interchange Southbound Exit、Zhonghuan Rd、Zhongzheng Rd intersection, which connects the trunk road of Xinzhuang District with heavy traffic during peak hours, the original ramp design and signal control caused Xinzhuang 2nd Interchange Southbound Exit to have a spillback queue around 500 meters in length, this also affects expressway main-lane traffic and traffic safety.This research took opening the divisional island for vehicles which are taking right turn to Zhongzheng Rd from the ramp to merge into surface road earlier and adjusting current signal plan as ramp improvement strategy and evaluate traffic assessment of nearby traffic condition before and after the improvement. |