英文摘要 |
"Since the 7th Container Center (the second phase of the Kaohsiung Intercontinental Container Terminal Project) of Port of Kaohsiung will start its operation in 2022, this study evaluates the traffic demand derived by the 7th Container Center and provides traffic improvement measures. The improvement measures include traffic management plans and engineering approaches, as well as container truck exclusive lane. Before the construction of National Freeway no. 7 finishes, this study suggests using alternative route to guide trucks relating to the Intercontinental Container Terminal avoiding the traffic bottleneck. In order to increase road safety by separating container trucks from other cars, this study also suggests setting up truck-exclusive lane on some parts of the alternative route. The long-term strategy is to promote the National Freeway no. 7 construction plan, which provides a direct route to the container terminal." |