英文摘要 |
Since the energy crisis touched the demand for alternative energy in the 1970s, and the signing of the Paris Agreement in France, wind power has sharp growth in green energy. For Taiwan, where natural resource is limited and homeland is small. Developing offshore wind power is one of the good choice for developing green energy especially Taiwan Strait with the excellent wind field. This paper has reported the challenges of offshore wind farm and the uncertainty of current development trend. It highlight the risk exposure during different stage from initial feasibility study, site selection, erection, operation to decommission. Past loss experience shows the type of loss and the severity of a potential loss case. Offshore Code of Practice (OCoP) and independent marine inspector (MWS) are used in Europe offshore wind farm to carry out the risk management. This risk management method can be a good reference for Taiwan. In addition, regards to Taiwan's unique sea characteristics and natural disasters, a specific design, construction, planning, risk management and third-party verification to compliant with Taiwan's special condition can ensure offshore wind farm to be implemented smoothly as well as operated successfully. |