英文摘要 |
The present paper discusses the construction gauge calculation ofoutward tilting for curved platforms of Taiwan Railways. The results ofclearance correction formula derived by the Taiwan Railways Administrationare insufficient to prevent the gap between the train and platform. Inthis paper, the clearance correction calculation procedure of outward tilting for curve platform is derived. The curve platform at Xike Station andGushan Station of Taiwan Railway has been discussed. The resultscalculated by present procedure are compared with the results by using theformula from the Taiwan Railways Administration. |