| 英文摘要 |
Although the route database of bus systems are indispensable in a monitorroutine, the traditional methods of special process can not deal with these datumefficiently. According to route datum of bus systems, this paper used GIS topropose three deductive methods of road names, station names and stationcoordinates. Furthermore, this paper uses empirical cases to illustrate theproposed methods, the results show that the construction times of bus routes canbe shortened within 5 minutes from 2.5 hours, and all conditions of route lengthand link can conform to within 96%. |