英文摘要 |
A religious regiment old church demolition construction project, these years are using the traditional procurement contracting model. That is, the owners of the architects to the relevant information and basic needs, and then by the architect after the initial design of the first meet the needs of the owners, after numerous meetings to discuss the completion of the details of the design after the contract, in the lack of manpower and professional lack Under such a way, really take a long time to waste a lot of time and cost. Therefore, this paper hopes to explore the current construction of the case, as well as the relevant laws and regulations related to the instructions and introduction, in order to facilitate the future construction of the unified planning strategy. After the results show that the package approach to the owners in terms of many advantages, such as the implementation of the design and construction of overlapping operations, can avoid the design and construction of the responsibility between the responsibility of each other, and integration of design and construction differences, and thus reduce coordination The short process, shorten the operation time, ensure and improve the quality of the project, reduce the manpower and responsibility of the project management, reduce the project cost, reduce the project disaster, etc., is to solve the traditional engineering model of the recipe. |